Hefeng platform
1.gineering cases:
2.SBS STEEL STRUCTURE PLATFORM
Steel structure platform, also known as the working platform.The structure of the prefab steel structure workshop building platform has a lot of kinds, its biggest feature is the structure of the whole assembly prefabricated steel structure barn, flexible design can be designed and manufactured according to different site conditions meet the site requirements, to meet its function and to meet the logistics requirements.
3.Product Detail information
1)Steel Structure Panel materialThe steel structure panel material included EPS sandwich panel,Rock wool sandwich panel,PU sandwich panel,fiber-glass ,steel sheet.
Steel structure panel material: including wall panel and roof panelSandwich core materials: EPS, PU, rock wool, glass woolThickness of sandwich panels: 50mm, 75mm, 100mm, 150mmSingle color plate material thickness: 0.376mm, 0.426mm, 0.476mm
5.Platform structure composition and classification:
(1) Composition: steel platform usually supported by the Inter-plated, primary and secondary beams, columns, columns, and ladders, railings and other components.
(2) Category:- According to the requirements can be divided into indoor and outdoor platforms to withstand static load and dynamic load platform, production support platform, as well as medium and heavy operating platforms.
According to different treatment of carriage, the platform structure can be divided into:1) directly rests on a tripod or bracket plant the platform column, function generally safe passage to a simple medium or platform.2) supported on the plant side columns or walls of buildings, on the other side with separate columns internet.3) supported on large equipment on the platform.4) all independent platform.
Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:Customer should provide:1) Translator or assistant on site.2.)All costs raised including: A. visa fee B. Round trip flight ticket C. Accident insurance for the supervisor during the period D. Accommodation E. Daily meals F. Internet G. Local traffic fee (if any)3) The customer should pay the engineer with supervision fee, which can be negotiated and decided by both.4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.There have some guidance installation picture: