国产国产乱老熟女视频网站97,超碰蜜桃,久久精品入口九色,丰满少妇猛烈进入A片高潮小说
Language:
CHINESES
ENGLISH
HOME
ABOUT US
Company profile
Factory tour
Certificates
PRODUCT
industry
agriculture
business
container
metal products
Building materials
Powder Coating
SERVICE
Customization process
Installation guide
Shipping policy
Design strength
PROJECT
Steel structure
container
NEWS
Latest News
products information
common problem
CONTACT US
Home
>
News
> Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
NEWS
Latest News
Products Information
Common Problem
CONTACT US
Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
Phone:0757-81002668/0757-63323396
Fax:0757-81196682
Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
E-mail:sbs@sbsprefabhouse.com
URL:http://www.yeskyyiqi.com
Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
Time:[2015-6-24] Hits:5431
Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
June 16, the third China Expo South is concluded, marking the construction of the Dianchi Lake in Kunming World Steel Works Exhibition Center project successfully put into use, and set to open steel big screen debut "Peacock" in the face of domestic and foreign visitors to the exhibition style. Guangzhou Steel
Dianchi Lake in Kunming World Exhibition Center project Steel Works Co., Ltd. invested by the construction of a Yunnan, Ltd. is responsible for the outer steel mesh deepen the design, manufacture, installation.
It is reported that the world's Convention and Exhibition Centre, Kunming Dianchi steel mesh semicircular distribution to the peacock as prototyping, volume 1.1 million tons, the use of domestic rare, Yunnan's first variable cross-section of bending and torsion of thin-walled shaped space fully welded structure, application of bending and torsion member total of more than 4100 pieces, bending and torsion ranks first in the number of components as much as similar projects in the country, and the viewpoint of bending and torsion of each member, there was no common direction. Especially in the main hall of the sequence of two vases, bending twist unprecedented degree, described as "like a column of non-column, non-beam like beam." Vases, 24 meters high, each 123 vases made of steel components assembled, each bar weighing 163 tons, the degree of bending and torsion vases shall also be a Yunnan most. The project was September 27, 2014 began lifting, and on January 29, 2015 two days ahead of the cap, which took 125 days. Guangzhou Steel
Product
Industry
Agriculture
Business
Container
Metalwork
Building Materials
Powder Coating
About ShengBang
Company Profile
Factory Tour
Certificates
Info Center
Latest News
Products Information
Common Problem
QR code of public account
Foshan Shengbang Steel Structure Co., Ltd.
Contact: 梁先生/Mr Leung
Phone: 18900873383/18900873268
Tel: 0757-81002668/0757-63323396
Fax: 0757-81196682
Email:
sbs@sbsprefabhouse.com
Skype:
sbs-Candy
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:
粵ICP備13078463號(hào)
Back To Top
0757-63323396
18900873383
Public Account